Item: Concrete formwork,modular aluminium formwork
Material: 6061-T6/6082-T6 aluminium alloy
Thickness of Material: 4mm
Type: Flat formwork, corner formwork, beam formwork, etc.
Formwork Weight: 18-22kg
Thickness of Formwork: 65mm
Safe Working Load: 60kN/m2
Cycle Times: ≥300
Shape: Rectangular, customized
Size: 0.5m-11.85m, non-standard: custom-made as your requirement
Process: Drilling, bending, welding, precise cutting, punching, etc.
Standard: EN755-9, GB/T6892-2015, GB5237.1-2008, JGJ386-2016
Package: Standard pallet with waterproof film, or according to your requirement.
Aluminium formwork is a construction system for forming cast in place concrete structure of a Building. Auto formwork system provides aluminium formwork for RCC, load-bearing, multi-storeyed buildings and enables the walls and slab to be poured in the same operation. This increases efficiency, and also produces an extraordinarily strong structure with excellent concrete finish.
INQUIRE ONLINE1. MONOLITHIC SYSTEM
Goldapple aluminum formwork system allows building for monolithic and /or 2 stages casting application to suit all kinds of building requirements.
2. Aluminum Panels-Extruded Sections
Our panels are all extruded sections by high pressure pressers thus giving the toughness strength required by construction need. They are mechanically linked together -not ONLY from welding
3. Aluminum ALLOY 6061-T6
6061-T6 is one of the most versatile of the heat-treatable alloys, is popular for medium to high strength requirements and possesses good to toughness characteristics. 6061-T6 has excellent corrosion resistance to atmospheric conditions and good corrosion resistance to sea water.
4. Aluminum PANELS WITH POWDER COATING
Goldapple patented ppwder coated aluminum form work achieves smooth concrete surfaces, more durable and easy to clean. No rendering is needed--savings on materials and labour costs.
5. STRONG& DURABLE DETAILS
6. EARLY STRIKE
Our early strike system allows slab panels to be striped after casing within 4 days and provide top quality surface finish on the concrete, by using our special designed prop head.
Rapid urbanization has resulted in a geometric increase in the housing demand, which cannot be fulfilled by using conventional methods of construction.
The traditional method of construction for mass housing & high rise buildings is a slow process and has limited quality control, particularly when a large size project is involved.
It is therefore obligatory to work out a method where the speed and quality of construction are controlled automatically by a systematic approach.
1. Multi- Storey Residential Complex
2. High- Rise Commercial Building-- Core wall
3. Bungalow & Villa
4. Civil Development
1. Speed
Ease in Shuttering / de- Shuttering and ability to perform monolithic concreting for any structures gives “Aluminum Formwork System” a superior advantage of speed. Using Aluminum Formwork System technology floor to floor cycle of seven days can be achieved.
2. Quality
"Aluminum Form System" is manufactured with precise tolerance providing High quality Formwork components which ensures the consistency of architectural dimensions.
3. Safety
A lot of importance is given to safety while designing the “Aluminum Formwork System” External brackets are provided which are fixed along the periphery of the structure at two levels for safe Erection and De- Shuttering of External Formwork.
4. Ease of Erection&De-Shuttering
A lot of Emphasis is given to the erection and De- Shuttering time of Formwork. Vertical and Horizontal members are locked through pins and Wedges. Vertical Formwork Components can be removed in 24 Hours and Horizontal Formwork Components can be removed in 72 Hours without disturbing the props so that the Formwork Components can be used for the Subsequent floors with second Set of Props.
5. Easy Material Handling
Light weight of the system ensures smooth flow of the component without the use of any External material Handling Equipment such as cranes and super decks as the Formwork Components can be easily transported to next level by a single person manually.
6. Highly Versatile & Durable
High Quality Aluminum alloys are used to manufacture “Aluminum Formwork System” with the highest standards of manufacturing methods and practices enabling the consumer to achieve as many as 300 usages, under Ideal conditions and proper handling.
7. Less Dependency on Skilled Workers
“Aluminum Formwork System” is made of lightweight Aluminum alloy which allows the big and small components to be hand carried and setup. Due to the elaborate Design and Drawings provided to the clients, erection old formwork can be achieved by unskilled workers with ease and accuracy.
8. Repeated use multiple times,low average use cost
Aluminum alloy building aluminum formwork system uses aluminum alloy profiles formed by integral extrusion of raw materials (6063-T6 or 6061-T6), a set of formwork can be used for more than 300 times in standard construction, with low average use cost.
Aluminum formwork manufacturing uses panels that are made from high strength Aluminum alloy.
The panels are held in position by a simple pin and wedge arrangement system.
The panel fits precisely, securely and requires no bracing.
It has sections that are large enough to be effective, yet light enough in the weight to be handled by a single worker.
Aluminum Formwork System is a construction system for forming cast in place concrete structure of a building. It is also a system for scheduling and controlling the work of other construction trades such as steel reinforcement, concrete placement and mechanical and electrical conduits.
The System is fast, simple, adaptable and very cost effective. It is unique because it forms all of the concrete in a building including walls, floor slabs, columns, beams, stairs, window hoods, balconies and various decorative features in exact accordance with the architects' design. The dimensional accuracy of the concreted work also results in consistent fittings of doors and windows. The smooth–off form finish of the concrete eliminates the need for costly plastering.
Aluminum Formwork System provides Aluminum Formwork for RCC load bearing or RCC framed multi-storied buildings and enables the walls and slabs to be poured in the same operation. These increases efficiency and also produces an extraordinarily strong structure with excellent concrete finish. Due to the fine tolerance achieved in the machined metal shuttering components, consistent concrete shapes and finishes are obtained floor after floor. This allows plumbing and electrical fittings to be prefabricated with the certain knowledge that there will be an exact fit when assembled.
Unlike other construction systems, Formwork Systems of Aluminum forms can be erected by unskilled labour and without the need for hoisting cranes. The largest panel weighs not more than 25 kgs which means it can be handled by a single worker.
1. Trial assembly of aluminum formwork in factory (Large surface).
2. Trial assembly of aluminum formwork in factory (Ladder).
3. Trial assembly of aluminum formwork in factory (Local art).
4. Trial assembly of aluminum formwork in factory (Corridor).
5. Trial assembly of aluminum formwork in factory (Interior).
6. Aluminum formwork installation at site.
7. Aluminum formwork installation at site.
8. Rebar on floor.
9. Concreting by concrete spreader.
10. Concreting.
11. Concreting.
12. Concrete caisson placing.
13. Effect after aluminum formwork removal.
14. Effect after aluminum formwork removal.
15. Effect after aluminum formwork removal.
Customer Support Solution
Considering our clients needs and providing options has been the hallmark of our commercial enterprise in view that day one. We sketch products that meet our customers requirements and demands. Special purposes and customized diagram could be a challenge. We lead the Aluminum formwork industry by continuously learning and creating new designs.
Aluminum Formwork
Our Aluminum formwork is a self-climbing system which is ordinarily used for residential, business and civil engineering projects. The whole bracket appreciably reduces the usual building period. As an extraordinarily secure and user-friendly system, Aluminum formwork is fine used for core wall building method (core-preceding) for high-rise buildings, pylons, and heavy structures.
The most vital element for a profitable structural development is the formwork system. We constantly present the most secure, efficient, trustful and satisfactory assured Aluminum formwork system handy on the market.
Pros of Aluminium Moulding Profiles